top of page

Dental Procurement and Supplier Management: A Guide for UK Practices

7 minutes ago
5 min read

Most practices that tighten up their stock control still leave money on the table, because counting what you have and controlling what you pay for it are two different jobs.

Stock control answers "how many boxes of gloves are on the shelf?". Procurement answers "who are we buying them from, at what price, and is that still the right answer?". The second question is usually the one nobody owns.


This is a practical guide to the buying side: where practices lose money, what good

procurement looks like at practice scale, and a review you can run this quarter.


Procurement and stock control are not the same thing

It is worth separating them, because practices that say "we've sorted our inventory" often mean only the first column below.


  • Stock control is about quantity and timing: what is on the shelf, what is running low, what is about to expire, what got used and by whom.

  • Procurement is about price and supplier: who you buy each product from, what you paid last time, who else sells it, who is authorised to order, and whether the invoice matched the order.


You need both. But procurement is where the recurring cost sits, and it is the side that tends to run on habit: this supplier because we have always used them, this price because nobody checked.


Where practices lose money on the buying side

Five patterns come up again and again.


1. Price creep nobody notices

Big price rises get spotted. Small ones do not. A few pence on a box you order forty times a year is invisible on any single invoice and material over twelve months. Without a price history per product, there is nothing to compare this invoice against except memory.


2. Supplier sprawl

Practices accumulate suppliers. One for consumables, one for implants, one for a product the first two stopped stocking, one a rep signed you up to three years ago. Each one adds a delivery charge, an account to reconcile, a separate price list, and less volume with any of them, which usually means a worse price from all of them.


3. Ordering by whoever noticed

When anyone can order, you get duplicate orders, off-list products, and no way to tell afterwards why something was bought. It also makes price negotiation impossible, because you cannot promise a supplier volume you do not control.


4. Emergency orders

Running out forces you to buy from whoever can deliver tomorrow, at their price, with next-day shipping on top. Every emergency order is a procurement failure that started as a stock-control failure, which is why the two have to be joined up.


5. Invoices nobody checks against the order

Short deliveries, substituted products, a quantity billed that did not arrive, a promotional price that quietly did not apply. If invoices are approved on sight rather than checked against what was ordered and received, none of this surfaces.


What good procurement looks like in a practice

This does not need a procurement department. It needs six things to exist somewhere other than in one person's head.


  1. One product list, with supplier codes. Every product you buy, with the manufacturer, the supplier's product code and the pack size. Without the code you cannot compare two suppliers' prices, because you are never quite sure it is the same item.

  2. A price history per product. What you paid, when, and to whom. This is the single highest-value record in procurement and the one most practices do not keep.

  3. A short approved supplier list. Two or three main suppliers, plus named specialists where you genuinely need them. Fewer accounts, more volume each, better terms.

  4. One owner, with a basket everyone can add to. Nurses and hygienists flag what they need; one person reviews and places the order. You keep the knowledge of what is actually running out without losing control of spend.

  5. Reorder levels per product. Set from what you actually use and how long that supplier takes to deliver. This is what converts emergency orders into planned ones.

  6. An invoice check. Order against delivery against invoice. It takes minutes per invoice and it is the only way price and quantity errors ever get found.


Questions worth asking your suppliers

Most practices never ask. Suppliers are rarely offended, and the answers are often better than you expect, particularly if you can show them your volume.


  • What is my price on the twenty products I buy most, and can it be fixed for a period?

  • Is there a better price at a larger pack size or a standing order, and would that actually suit our usage?

  • How much notice do we get before a price change?

  • What is the delivery charge, and what order value removes it?

  • What happens on backorder, and will you tell us before shipping a substitute?

  • Can we return short-dated stock, and on what terms?


A procurement review you can run this quarter

You do not need new software to start. You need twelve months of invoices and an afternoon.

  1. Pull twelve months of supply invoices from every supplier, including the ones you only use occasionally.

  2. Rank your spend. Total by supplier, then by product. A small number of products will account for most of the money, and those are the only ones worth negotiating.

  3. Price-check the top twenty. Same product code, same pack size, across your suppliers. Note where you are paying more than you need to, and by how much.

  4. Look for price rises you missed. Compare the first and last invoice of the year for those same products. This is usually the uncomfortable part.

  5. Consolidate and set levels. Close the accounts you barely use, agree terms with the ones you keep, and set a reorder level for every product on the list.


If step four is painful, our post on cutting dental supply costs without compromising quality covers what to do about it.


Where Denven fits

The reason procurement runs on habit in most practices is that the record needed to do it properly does not exist. Denven builds that record as a by-product of ordinary stock work.


You upload a supplier invoice and Denven reads the products, quantities and prices off it, so every purchase lands in the system without being typed in. Each price goes into a price history for that product, and Denven flags it when a supplier puts a price up, before you pay the next invoice. Product records hold the supplier code, storage location, order date, quantity and price, so you are comparing like with like, and you can monitor consumption, usage trends and pricing across different suppliers in one place.


On the ordering side, products go into a basket for reordering with quantities you can adjust, so the team can flag what they need and one person still places the order. Reordering suggestions are based on your historical usage trends, orders and backorders are tracked in real time, and low-stock and expiry alerts are what stop the emergency orders in the first place. Financial reports and forecasting then give you the usage figures to take into a price conversation.


The short version

Procurement is not a bigger version of stocktaking. It is a separate discipline that needs three records: what you buy, what you paid for it historically, and who you bought it from. Keep those and the rest of it, consolidating suppliers, negotiating, catching price rises, becomes straightforward. Without them, you are negotiating blind.

For the stock-control side of the picture, start with our guide to dental inventory management software for UK practices. Or if you would like to see your own invoices and supplier prices in one place, book a short demo and we will walk through it with your products.

Comments

Rated 0 out of 5 stars.
No ratings yet

Add a rating
bottom of page